<?xml version="1.0" encoding="UTF-8"?>
<rss xmlns:content="http://purl.org/rss/1.0/modules/content/" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:rdf="http://www.w3.org/1999/02/22-rdf-syntax-ns#" xmlns:taxo="http://purl.org/rss/1.0/modules/taxonomy/" version="2.0">
  <channel>
    <title>topic Re: workflow set maximum queued items in Data Engineering</title>
    <link>https://community.databricks.com/t5/data-engineering/workflow-set-maximum-queued-items/m-p/101753#M40811</link>
    <description>&lt;P&gt;Unfortunately there is no way to control the number of jobs that will be moved to queue status when queuing is enabled.&lt;/P&gt;</description>
    <pubDate>Wed, 11 Dec 2024 11:58:19 GMT</pubDate>
    <dc:creator>Walter_C</dc:creator>
    <dc:date>2024-12-11T11:58:19Z</dc:date>
    <item>
      <title>workflow set maximum queued items</title>
      <link>https://community.databricks.com/t5/data-engineering/workflow-set-maximum-queued-items/m-p/86291#M37310</link>
      <description>&lt;P&gt;Hi all,&lt;/P&gt;&lt;P&gt;I have a question regarding Workflows and queuing of job runs. I'm running into a case where jobs are running longer than expected and result in job runs being queued, which is expected and desired. However, in this particular case we only need a single job run to be queued and don't need potentially dozens of job runs to be queued. A single job run would suffice to recover in this particular case.&lt;/P&gt;&lt;P&gt;Is possible to configure a maximum amount of queued job runs?&lt;/P&gt;&lt;P&gt;Thanks&lt;/P&gt;</description>
      <pubDate>Thu, 29 Aug 2024 11:27:23 GMT</pubDate>
      <guid>https://community.databricks.com/t5/data-engineering/workflow-set-maximum-queued-items/m-p/86291#M37310</guid>
      <dc:creator>Anonymous</dc:creator>
      <dc:date>2024-08-29T11:27:23Z</dc:date>
    </item>
    <item>
      <title>Re: workflow set maximum queued items</title>
      <link>https://community.databricks.com/t5/data-engineering/workflow-set-maximum-queued-items/m-p/101753#M40811</link>
      <description>&lt;P&gt;Unfortunately there is no way to control the number of jobs that will be moved to queue status when queuing is enabled.&lt;/P&gt;</description>
      <pubDate>Wed, 11 Dec 2024 11:58:19 GMT</pubDate>
      <guid>https://community.databricks.com/t5/data-engineering/workflow-set-maximum-queued-items/m-p/101753#M40811</guid>
      <dc:creator>Walter_C</dc:creator>
      <dc:date>2024-12-11T11:58:19Z</dc:date>
    </item>
  </channel>
</rss>

