Join discussions on data engineering best practices, architectures, and optimization strategies within the Databricks Community. Exchange insights and solutions with fellow data engineers.
I have a DLT that runs every day and an automatically executed maintenance job that runs within 24 hours every day. The maintenance operations are costly, is it possible to change the schedule to once a week or so?