cancel
Showing results for 
Search instead for 
Did you mean: 
Data Engineering
Join discussions on data engineering best practices, architectures, and optimization strategies within the Databricks Community. Exchange insights and solutions with fellow data engineers.
cancel
Showing results for 
Search instead for 
Did you mean: 

Alert monitoring, not running in schedule

REM1992
New Contributor

Hello, I think the alert that I set is not running on the schedule that I set , every day 9 am JST time. 

It shows up like it is running, with the symbol of running moving , but it says since 2025/1/7 while it should have been run at 2025/1/8 9:00 am JST. It doesnt change even if I press refresh button. 
Please find images attached for reference. 

I want to understand what could be happening. 

Thanks in advance

1 REPLY 1

Walter_C
Databricks Employee
Databricks Employee

The day showing there is the day since the first time it was executed, if you check on the job runs do you see that there are jobs running every day on that period of time?

Join Us as a Local Community Builder!

Passionate about hosting events and connecting people? Help us grow a vibrant local community—sign up today to get started!

Sign Up Now